HPN FLEX
Sizer

Size the house at the real outdoor temperature

Type the ZIP. With a ZIP, the heating load uses the design temperature on file for that place. Without one, this page stays on the state rule of thumb. Show the math when they ask how you got it.

Heating load
19,000 BTU/hr
Cooling load
6,650 BTU/hr
System band
1.5 to 2 tons
Design temp
1F
ASHRAE 99.6% for MA
Application

New/ducted home: a central air handler reuses the duct distribution.

Coverage band: undersized. Deal basis: estimated.

Airflow check
800 CFM

2 x 20x25 filter-back return (or 400-800 sq in net free area equivalent)

Airflow rules of thumb (400 CFM per ton nominal, 350 humid / 450 dry; return free-area sizing). Confirm with a static-pressure test and Manual-D before install.

Build the quote from this loadCompare operating cost first

Plan for this house

New Ducted

New/ducted home: a central air handler reuses the duct distribution.

Lead with New ducted heat pump: One central heat pump that reuses the duct distribution for whole-home heating and cooling. Present the 1 brand-neutral fallback option(s) only if the homeowner declines the heat pump, and always price the lit option beside any fallback.

New ducted heat pumpNew ductless heat pumpDucted air handler + ductless head (hybrid)
Heating load19,000 BTU/hr
Cooling load6,650 BTU/hr
ControlHeat pump control
ZoningSingle zone
Lineset25 ft equivalent, derate 0.94x
Thermostat wiring5 conductors, C required
Airflow220 CFM target
ElectricalConfirm data plate MCA/MOP
Cancellation3 business-day notice if signed at home
  • No fossil furnace on file. Confirm the existing heat source before setting a dual-fuel switchover; otherwise size electric backup or run heat-pump-only.
  • Run is 0.4 ft past the 24.6 ft factory pre-charge: add refrigerant per the model charge rate (see refrigerantChargeEstimate) and weigh it in.
  • Confirm the O/B reversing-valve orientation against the equipment (most energize O on cool).
  • A C (common) wire is required for modern wifi / smart controls. Verify a true common is landed, not a jumper.
  • Maintain condenser clearances: ~12 in sides, 24 in service side, 60 in overhead, 6 in back. Confirm exact values against the model install manual.
  • Confirm the condensate path: gravity drain if a downhill route exists, otherwise a condensate pump with a float safety switch.
  • Snow region: mount the condenser on a stand/riser above the expected snow line, keep the base-pan drain clear, and protect from roof-shed ice. Wall brackets help in heavy drift.
  • Coastal / salt air: specify a corrosion-protected coil and schedule periodic fresh-water coil rinses to fight salt corrosion.
Build the jobSize the houseCompare yearly costOpen the house file