HHPN FLEX
Command
House file

Whitfield residence

FLEX-DEMO-07 · install · VT · 2025-09-11 · demo book

Demo file. This id is from the labeled demonstration book, not a live tenant row.
Next move

Next: heating or cooling load.

Readiness is a completeness score from what is on the job file. It is not a close-rate prediction.

Price itCompare operating costScope the jobOpen Command
Readiness
76
hot

File checklist

  • Stage has moved past a raw lead
  • Homeowner name is on the file
  • State is known so rebates can resolve
  • Heating or cooling load is on the file
  • A system is selected
  • An installed price is computed
  • State or utility incentives are on the quote
  • Validation is clean
  • The close is signed
  • A deposit is captured

Plan for this house

Hydro Air Conversion

Hydronic home with no ducts: forced-air conversion needs new ducts; ductless multi-zone is usually faster and cheaper. Compare both.

Lead with Boiler / hydronic to heat pump: Move off the boiler to a heat pump that heats AND cools, something the boiler never did. Present the 1 brand-neutral fallback option(s) only if the homeowner declines the heat pump, and always price the lit option beside any fallback.

Boiler / hydronic to heat pumpWhole-home ductless multi-zone
Heating load31,500 BTU/hr
Cooling load32,500 BTU/hr
ControlHeat pump control
ZoningDuctless multi-zone (refrigerant-side)
Lineset25 ft equivalent, derate 0.94x
Thermostat wiring0 conductors
Airflow1,084 CFM target
ElectricalConfirm data plate MCA/MOP
Cancellation3 business-day notice if signed at home
  • Hydronic boiler home: an air-to-air heat pump cannot share a control with the boiler the way a furnace coil does. Keep the boiler as an independent backup, or convert to forced-air. This is not an integrated furnace dual-fuel job.
  • Ductless multi-zone: no dampers, no bypass, no zone panel. Do not apply ducted damper air rules or a hydronic zone control.
  • A new air-zoned heat pump is overlaying an existing hydronic-zoned boiler. These are two independent zoning systems: the air dampers/heads and the boiler zone valves must not share a controller. Plan separate controls.
  • Run is 0.4 ft past the 24.6 ft factory pre-charge: add refrigerant per the model charge rate (see refrigerantChargeEstimate) and weigh it in.
  • Ductless head: no 24V R/C thermostat. Use the OEM wired wall controller or IR remote on the manufacturer communication bus.
  • Maintain condenser clearances: ~12 in sides, 24 in service side, 60 in overhead, 6 in back. Confirm exact values against the model install manual.
  • Confirm the condensate path: gravity drain if a downhill route exists, otherwise a condensate pump with a float safety switch.
  • Snow region: mount the condenser on a stand/riser above the expected snow line, keep the base-pan drain clear, and protect from roof-shed ice. Wall brackets help in heavy drift.

Coverage on this house

Parts term and labor term are what this shop writes on the contract. Flex does not assume a manufacturer labor term is present on this house.

Available is not the same as present. Register the system if the program requires it. Do not invent a second service plan. Do not quote a dead federal credit.

Programs for this house
Efficiency Vermont
Statewide, up to $2,200
Burlington Electric DepartmentGreen Mountain PowerVermont Electric Cooperative

You claim the program that serves your address, not the total. Confirm current terms with each program before counting on an amount. ZIP only confirms the state. Name the utility before you tell the homeowner which program is theirs.

Close line for this house

It costs more than a furnace swap.

A furnace quote is the box. This quote is the heating and cooling plant for the next 15 years, with the state and utility programs already netted. Walk the operating-cost compare, then the net after incentives. Do not apologize for the sticker.

Do not invent a monthly savings number. Run Compare on this address and use that sheet.