HHPN FLEX
Sizer

Size the house at the real outdoor temperature

Four answers. A heating and cooling load using the ASHRAE outdoor temperature for that state. Show the math when they ask how you got it.

Heating load
19,000 BTU/hr
Cooling load
6,650 BTU/hr
System band
1.5 to 2 tons
Design temp
1F
ASHRAE 99.6% for MA
Application

Hydronic home with no ducts: forced-air conversion needs new ducts; ductless multi-zone is usually faster and cheaper. Compare both.

Coverage band: undersized. Deal basis: estimated.

Airflow check
800 CFM

2 x 20x25 filter-back return (or 400-800 sq in net free area equivalent)

Airflow rules of thumb (400 CFM per ton nominal, 350 humid / 450 dry; return free-area sizing). Confirm with a static-pressure test and Manual-D before install.

Build the quote from this loadCompare operating cost first

Plan for this house

Hydro Air Conversion

Hydronic home with no ducts: forced-air conversion needs new ducts; ductless multi-zone is usually faster and cheaper. Compare both.

Lead with Boiler / hydronic to heat pump: Move off the boiler to a heat pump that heats AND cools, something the boiler never did. Present the 2 brand-neutral fallback option(s) only if the homeowner declines the heat pump, and always price the lit option beside any fallback.

Boiler / hydronic to heat pumpWhole-home ductless multi-zone
Heating load19,000 BTU/hr
Cooling load6,650 BTU/hr
ControlHeat pump control
ZoningSingle zone
Lineset25 ft equivalent, derate 0.94x
Thermostat wiring5 conductors, C required
Airflow220 CFM target
ElectricalConfirm data plate MCA/MOP
Cancellation3 business-day notice if signed at home
  • Hydronic boiler home: an air-to-air heat pump cannot share a control with the boiler the way a furnace coil does. Keep the boiler as an independent backup, or convert to forced-air. This is not an integrated furnace dual-fuel job.
  • A new air-zoned heat pump is overlaying an existing hydronic-zoned boiler. These are two independent zoning systems: the air dampers/heads and the boiler zone valves must not share a controller. Plan separate controls.
  • Run is 0.4 ft past the 24.6 ft factory pre-charge: add refrigerant per the model charge rate (see refrigerantChargeEstimate) and weigh it in.
  • Confirm the O/B reversing-valve orientation against the equipment (most energize O on cool).
  • A C (common) wire is required for modern wifi / smart controls. Verify a true common is landed, not a jumper.
  • Maintain condenser clearances: ~12 in sides, 24 in service side, 60 in overhead, 6 in back. Confirm exact values against the model install manual.
  • Confirm the condensate path: gravity drain if a downhill route exists, otherwise a condensate pump with a float safety switch.
  • Snow region: mount the condenser on a stand/riser above the expected snow line, keep the base-pan drain clear, and protect from roof-shed ice. Wall brackets help in heavy drift.
Scope the jobSize the houseCompare yearly costOpen the house file